If you need any explaination about this form contact ammar.aljer@univ-lille.fr

Activity Name:

Exercise plan WP2

Activity Numbre:

131

Activity type

Other

Involved Workpackage

Flood defences
Emergency response
Knowledge infrastructure

Objective

Activity Brief descriptor

Report that describes the work process during an emergency reparation. This forms the basis of all activities of WP2. It describes the process from Observing Diagnosing and Prognosis and Execution. This process is worked out and coupled to the activies executed by WP2.

Linked to theme(s):

Breaching
Animal- & vegetation-induced anomalies
Erosion processes
Temporary levee repairs
Levee survey & monitoring technique
Prolonged collaboration

Activity Time

Start Date:

Dec. 15, 2019, midnight

End Date:

Feb. 15, 2020, midnight

Active time length:

Days:

None

Hours:

None

Other:

Location

Levee stretch:

Other

Coordinates/ Latitude (WGS):

None

Coordinates/ Longitude (WGS):

None

Coordinates/ Altitude (mTAW):

None

Descriptor:

Other references:

Data

Data: 1

Data type: report
Description:
Date availability: None
Media avaliable:
Find media:

Data: 2

Data type: appendic
Description: pdf
Date availability: None
Media avaliable:
Find media:

Relationships with other activities

This activity has no relation with the other activities

Detaled information about the activity

Pre-conditions

Activity Descriptor

Equipments

this activity does not have equipments

Monitoring & Sensors

this activity does not have sensors

Limits

During Activity

Post-activity conditions

Immediate Results

Results /Conclusion

Infrastructure Knowledge

Other key information