If you need any explaination about this form contact ammar.aljer@univ-lille.fr

Activity Name:

Emergency Response Exercise

Activity Numbre:

134

Activity type

Exercise

Involved Workpackage

Flood defences
Emergency response
Knowledge infrastructure

Objective

Simulating the emegerncy response meeting without real danger Give young professionals of different fields an insight in the process

Activity Brief descriptor

Participants of the Late Summer School did a role play to simulate an emergency response meeting for a possible levee breach. Each had different roles, tasks and knowledge assigned.

Linked to theme(s):

Breaching
Animal- & vegetation-induced anomalies
Erosion processes
Temporary levee repairs
Levee survey & monitoring technique
Prolonged collaboration

Activity Time

Start Date:

Sept. 29, 2022, 3 p.m.

End Date:

Sept. 29, 2022, 5 p.m.

Active time length:

Days:

None

Hours:

3.0

Other:

Location

Levee stretch:

Other

Coordinates/ Latitude (WGS):

None

Coordinates/ Longitude (WGS):

None

Coordinates/ Altitude (mTAW):

None

Descriptor:

Other references:

Data

This activity has no data

Relationships with other activities

Detaled information about the activity

Pre-conditions

None of the participants is experienced in emergency responses

Activity Descriptor

Simulating dike monitoring and a simulation of a crisis meeting

Equipments

this activity does not have equipments

Monitoring & Sensors

Sticks to measure the dimensions of holes in the levee

this activity does not have sensors

Limits

Knowledge, experience of the participants Time (no repetitions possible)

During Activity

It was very helpful to have Marian which helped and observed during the exercise Especially the chairman seemed to realise during the experiment how much decision making is expected of him

Post-activity conditions

Immediate Results

Awareness of the participants Sensibility for the process and its challenges

Results /Conclusion

The group was able to learn about how crisis managers and decisionmakers have to work through a crisis. The group gained a new respect and knowledge base for these offcials and how the process should work.

Infrastructure Knowledge

The content of the exercise has to be even more clear and simple to waste no time by talking about the content but the process
By evaluating during and after the exercise

Other key information