If you need any explaination about this form contact ammar.aljer@univ-lille.fr

Activity Name:

Exercises (small and large scale combined)

Activity Numbre:

140

Activity type

Exercise

Involved Workpackage

Flood defences
Emergency response
Knowledge infrastructure

Objective

Main KTF of the small and large scale exercise.

Activity Brief descriptor

Knowledge/data/photos of the performed exercises (small and large scale). These exercise have multiple objectives, ranging from testing the APP2C to replacing emergency response measures. Every exercise has their own KTF and is linked to this main one. The difference between small and large scale exercise is the scale. In the large-scale exercises the complexity increass with emergency exercises, real damages, and levee posts. This is done in combination with international collaborations and multi-exercises. Small-scale exercises are more simplistic and are mostly levee inspection exercises. These are mono-exercises and sometimes with real damages. This relationship is also visualized in the picture on the drive. The objectives and structure is also explained in the Exercise plan, which can be found on the OneDrive.

Linked to theme(s):

Breaching
Animal- & vegetation-induced anomalies
Erosion processes
Temporary levee repairs
Levee survey & monitoring technique
Prolonged collaboration

Activity Time

Start Date:

Sept. 1, 2021, 9 a.m.

End Date:

Feb. 28, 2023, 9 a.m.

Active time length:

Days:

None

Hours:

None

Other:

Location

Levee stretch:

Other

Coordinates/ Latitude (WGS):

None

Coordinates/ Longitude (WGS):

None

Coordinates/ Altitude (mTAW):

None

Descriptor:

The levee inspection exercises are mostly located along streches of the levee. When xercises with repair measure are conducted, the precise location is indicated.

Other references:

Data

Data: 1

Data type: Folder with photos and data of the excerises
Description:
Date availability: None
Media avaliable:
Find media:

Relationships with other activities

Detaled information about the activity

Pre-conditions

Activity Descriptor

Small scale: approx 19 days Large scale: approx. 8 days

Equipments

Equipment: 1

Equipment for levee inspection is described in the document 'Guidelines leveeguarding' and in the form on small-scale exercises.

Monitoring & Sensors

this activity does not have sensors

Limits

During Activity

Post-activity conditions

Immediate Results

Results /Conclusion

Infrastructure Knowledge

Other key information